Worked example
Reconcile before you report
A bill, a calendar-month meter reading and the sub-meter totals do not agree. The application separates period differences from real gaps and lists what is still open.
Simulated records for illustration.
- 144.0 MWh
- bill, 26 Aug – 26 Sep
- 144.6 MWh
- main meter, same period: 0.6 MWh still to check
- 8 h
- missing on sub-meter B, not estimated